色琪琪女色窝77777_18岁禁入污污污绿巨人小蝌蚪_东京热男人av天堂_大地二资源网高清免费播放_国产真实乱了伦对白视频_国产学生处被破的视频_欧美大胆人体艺术图片_中国女人真人一级毛片_久久99欧美亚洲怡红院影院精品

Europe

CTG Europe is an attractive strategic platform in European market. It was established in 2011 and the headquarter is located in Luxembourg. There are around 125 employees now with 85% local personnel.

CTG Europe focuses on investment, development and operation of clean energy in Europe and North America, it is the unique Chinese SOE that takes majority stakes of an EU offshore wind farm, and the single largest shareholder of EDP. The total capacity of CTG Europe till year 2020 is nearly 7Gw (including equity-based capacity and capacity from projects under construction).

Portugal

  • ENEOP Wind Project

    Name:

    ENEOP Wind Project

    Type:Wind

    Location:

    Portugal

    Installed Capacity:422.3 MW

  • PT Wind Project

    Name:

    PT Wind Project

    Type:Wind

    Location:

    Portugal

    Installed Capacity:636 MW (49% ownership)